By July 3rd the building had been painted with siding to blend with the brick and stone of our house, eaves and doors to match those of the house.
This shows the
greenhouse side.
Four skylights
are on the roof.
Masonry Contractor, Robert Garrett and his son, Brian took a break from the current job on another of Dan Dunn's projects to deliver some bricks July 11th.
Carpenter Bob is camera shy. So he looked to the side when I asked for a picture. He thought it a bit off when he
learned that we wanted one half the building walls covered with pegboard and the other half with concrete siding. The pegboard is great for hanging tools and the concrete siding is water resistant for the plant side.
Electrical boxes for the porch lights dangle on wires from the porch gables.
Brick columns next ...