August 1, 2004

Greetings from Granbury - 5
Shop Construction - Windows & Doors Today

June 30th, 2004 — Page 1

Window-East-063004-842a

You have to get up early to get ahead of this crew. This picture was taken at 8:42 AM, and they already had most of the windows installed in the building!

We did get there in time to see one of the windows and both door installed, however.

Windows-South-063004-843a

We were just in time to see a couple of the men fastening the middle south windows into position.

Windows-South-063004-844a

Double window unit goes in.

Below: Men complete the framing for the front porch while two installing siding pause to listen to the man on the ground with the tape measure.

Windows-South-063004-845"a"
FrontPorch-063004-1005a

This is getting long enough for the load time for dial up connections. So we'll continue on the next page. To be continued on next page ...