 June 18, 2004
Continued from page 2.
Greetings from Granbury - 3, page 3
|
It's 1:46 PM and the truck has arrived. It's like threading a needle backing down our long narrow driveway and between two trees to the drive court. Then he must back though a space not much wider than the truck between the garage and a tree. Crewchief Delfino directs him to the site with expertise.
|
This picture was taken at 2:48 PM and the third load is doing the pour of the walk into the building.
They will use wheel barrows to take the mix to the walkway to the house, and reposition the truck to pour the extention of the driveway beside the building.
|
|
|
3:02 PM Working the walkway.
|
6:56 PM
Forms come off.

It's now 7:30 PM. It's been a long, long, day for Delfino and his three helpers.
He uses a rotary machine to polish the slab. He makes it so smooth that we could hold a dance on it.
That's all for now, until next time.
Best Regards to all ... Pat