July 28, 2004
June 23rd, 2004 — Page 2
It's 9:35 AM and the first wall is up!
Right: It takes the whole crew to lift the 28 foot wall on to the slab and stand it up. This wall goes up at 9:50 AM.
The East wall goes up at 9:58 AM.
This is getting long enough for the load time for dial up connections. So we'll continue on the next page. To be continued on next page ...
Greetings from Granbury Page Navigator
Shop Building Construction Page Navigator